Đang tải... Vui lòng chờ...
Project

Airtech Cleanroom is pleased to offer a wide range of top quality, custom made cleanroom furniture and accessories to meet our customers unique fit-out requirements. These products are manufactured either by our partner in China.

Our in-house manufacturing capability provides a distinct advantage when compared to other cleanroom vendors as we can offer a complete customised service to our clients. We are able to provide a range cleanroom furniture suitable for all types of cleanrooms from modular cleanrooms to soft-wall cleanrooms.

The table below can be searched or browsed to view our range of cleanroom furniture and fit-out. We also offer tailored cleanroom solutions to our clients to ensure the best possible working environment according to the requirements of the clean room.

Order by:

Element Six

Project: Element Six.
Location: Shannon, Ireland.
Cleanroom: Class 10,000


Modular Cleanroom installation for micron diamond material processing. Elimination of any potential contamination sources is essential to Micron Diamond Production. This Class 10,000 installation included a change room, goods area, material isolation area, HVAC and internal fit-out.

PROJECT SCOPE:

In 2011, NGS was awarded the contract to construct a class 10,000 Cleanroom for Element Six in Shannon for micron diamond materials processing. This Ultrafine Cleanroom, constructed using our Octanorm Cleanroom system is 230m² and consists of a main production room, a materials preparation area and a gowning room. There is a personnel interlocked air shower for operator entry/exit and 2 interlocked pass through units for raw and finished materials. The scope of this project also required a solution for air conditioning and cooling (HVAC) as the internal heat load for the process was indicated to exceed 90kw. We utilised textile ducts to distribute air around this room as a very high volume of air change and delivery was required. Full electrical integration and the supply of DI water, compressed air, sprinkler systems and plant electrics were all part of the installation and fit out. Bespoke change and gowning room furniture and storage solutions in the materials preparation area were also designed, supplied and installed.