Đang tải... Vui lòng chờ...
Project

Airtech Cleanroom is pleased to offer a wide range of top quality, custom made cleanroom furniture and accessories to meet our customers unique fit-out requirements. These products are manufactured either by our partner in China.

Our in-house manufacturing capability provides a distinct advantage when compared to other cleanroom vendors as we can offer a complete customised service to our clients. We are able to provide a range cleanroom furniture suitable for all types of cleanrooms from modular cleanrooms to soft-wall cleanrooms.

The table below can be searched or browsed to view our range of cleanroom furniture and fit-out. We also offer tailored cleanroom solutions to our clients to ensure the best possible working environment according to the requirements of the clean room.

Order by:

Apple Operations Europe

Project:   Apple Operations Europe.
Location:   Cork, Ireland.
Cleanroom:   Class 1,000 (Class 100 work areas)

PROJECT SCOPE

In early 2010, NGS were awarded the contract to construct a Class 1,000 Cleanroom including HVAC and air-conditioning system for the Apple manufacturing site in Cork. This is the only Apple owned manufacturing plant in Europe and is responsible for the build and configuration of the iMac product for the European market. Within this Cleanroom which we constructed using our Octanorm Cleanroom system, the main glass front is fitted to the iMac on a zoned conveyor where the operational area of Class 100 is achieved by using additional ceiling integrated fan filter units being mounted above the conveyor areas. The dual sided, multi-zoned belt conveyor has 6 stations where operators complete their tasks before the product automatically moves to the next operation. This is the final assembly operation which takes place after configuration and extended test but prior to packaging. The total Cleanroom area is approximately 165m² of which 110m² is production area, and the remainder being allocated to an R&D lab, a gowning room and a 4 person air shower. The internal fit-out and integration of the Cleanroom was also managed by NGS including the installation of a belt conveyor which ran from the in-feed straight through the clean room and linked up with the packaging conveyor at the out-feed. Complete PLC and electrical integration was included along with vinyl flooring, edge protection and material pass through solutions. The overall Cleanroom design was completed on our behalf by our German partners Solutions and Handling and delivered as a turn-key solution by NGS.